Contractor shall field verify all existing conditions including the locations of structural mechanical electrical piping and conduit prior to proceeding with the demolition work.
Roof demolition notes.
General notes new construction on sheet a200 102.
General demolition notes 1.
You can rest easy knowing that we do exceptional.
The demolition drawings have been developed from.
Existing roof drain systems are to remain fully operational functional during the re roofing and design build contractor is responsible for providing temporary protection during demolition and renovation activities.
Information contained here is a result of limited field verification.
12 13 14 interior finishes shall be class c surface flame spread rating of 76 200.
The contractor shall be responsible for any damage caused during the performance of their contracted work.
See structural drawings for top of steel t o s at all proposed roofs.
949 768 7048 owner operated provides you with reliable roofing tear down demolition and professional work.
At the removed fasteners in all existing masonry walls and floors patch hole with grout level with existing adjacent substrates in order to receive new finishes.
However the hazards of demolition work can be controlled and eliminated with the proper planning the right personal protective equipment necessary training and compliance with osha standards.
General notes for demolition plan 101.
The roof is to perform under category 5.
Roof plan general notes a the replacement of the roof shall be conducted in such a manner as to protect the existing building and all of its contents in their entirety.
You ve got endless choices exceptionally so you want to make sure you hire the right team.
General notes for project on project information sheet g001 b.
No trench overcuts allowed at finished slab areas.
Employee in aerial lift killed when roof collapses.
At the demolition of an existing item remove all traces of the demolished items components from the surface of the remaining floor walls ceiling and roof.
General demolition notes 1.
Comply with the requirements of the following notes in this set of drawings which also apply to the demolition floor plans.
Two demolition workers die of burns after flash fire at warehouse.
Existing roof drains are to be cleaned and maintained free of debris during re roofing.